The
interesting story here is that the hardware is already built and in
use and we have no need to do more. It is basic enough and it is
easily applied.
Yet
laying track is not cheap either and building a convenient grade can
be a problem. In the meantime, it really has to be an automatic
system that needs no supervision.
However,
old track and a fresh set of ties can be good enough here. Speeds
will be terribly slow that this minimizes wear and tear.
Sometimes
simple old systems do a fine job if costs are low enough. As well,
most windmills are build on high points to begin with and a stiff
incline should be easy to come by.
ARES (Advanced Rail Energy Storage)
https://www.youtube.com/watch?v=zshJwVlbOeM
No comments:
Post a Comment